Call Us +86 15562275013

Cainiao Smart Logistics

Project Name: Cainiao Smart Logistics
Project Location: Dong Nai, Vietnam
Project Dimensions: 800*300*9 (80,000 m² total area)
Tonnage: 400 tons
Quotation: 750 USD/ton

Project Introduction:
This is a modern smart logistics center construction project covering an area of 80,000 m². The project utilizes a large-span steel structure system, consisting of multiple buildings designed for storage and sorting functions. The overall structural layout adopts a multi-unit bent arrangement of 800+300+9 meters to meet the operational demands of large, column-free logistics spaces.

During the construction process, approximately 400 tons of steel were used, primarily comprising steel columns, beams, bracing components, and roofing systems. The construction site was organized into zones for phased progress, with sorting warehouses and distribution areas advancing simultaneously to ensure rapid installation of the main structure within a tight schedule.

REQUEST A QUOTE TODAY

* indicates required fields

See Some of Our Latest Projects

get Best quote now
Please provide detailed information such as product parameters and dimensions as much as possible, so that we can calculate the shipping cost.